SZRBS manufactures metal components in Shenzhen for interior directory sign systems and coordinated wayfinding families across hotels, offices, financial environments and large developments. Each directory panel, directional sign and room identifier can be labeled to the approved message schedule and destination plan.
When pricing a directory and wayfinding package, list the main directories, elevator-lobby signs and directional signs as separate line items. Include each sign location, message, size and quantity, and flag any directory panels that need replaceable inserts. Request a directory and wayfinding quote.
Applications
- Wall and suspended directional signs
- Floor directories
- Elevator-lobby signs
- Room and department identification
- Back-of-house wayfinding
Interior directory sign systems
Directory sign systems organize destinations at entrances, elevator lobbies and major decision points. A project may combine wall-mounted directories, suspended directional signs, floor identifiers and room signs. Coordinated materials, typography, arrows and mounting details help visitors move from the main directory to the final destination.
Manufactured to the message schedule
Send the approved sign-type drawings and message schedule with a unique sign code for each location. SZRBS can label the manufactured components and packing documents with the same codes, helping the site team check quantities and distribute signs to the correct floor or zone.
Changeable and fixed information
Identify which directory messages are permanent and which may change after occupancy. Removable inserts, replaceable panels or modular rails can be reviewed where future updates are expected. Final readability, accessibility, mounting height and local code compliance remain subject to approval by the project designer or local consultant.
Materials and finishes
Available materials include 304 and 316 stainless steel, brass, aluminum and acrylic. Common thickness options are 0.8, 1.0, 1.2, 1.5, 2.0, 5.0 and 10.0 mm, with final suitability confirmed from the sign type, size and structure. PVD finishing is coordinated with external finishing partners and reviewed by SZRBS against the approved reference.
Production and quality control
Metal etching and paint filling are completed in-house. OEM/ODM production and customer-supplied drawings are accepted. Production is released against approved artwork and fabrication details, with checks covering dimensions, surface appearance, color, hardware, numbering and packaging labels.
Commercial terms
The minimum order quantity is one set. A single sample can be produced, with a typical sample lead time of 5–7 days. Typical bulk production is 10–15 days after sample and drawing approval. A three-year warranty is available, with the final coverage confirmed in the quotation.
Packaging for project delivery
Sign-code labels, elevation/room references, grouped cartons and export wooden crates. Export wooden crates and internal protection are adjusted to the product size, fragility, shipment method and destination schedule.
What to include with an RFQ
- Vector artwork or dimensioned drawing
- Material grade, thickness and finish
- Overall size and mounting method
- Message or location schedule
- Quantity by type
- Delivery destination and required date
Related project guidance
Can directory panels use replaceable messages?
Yes. Changeable inserts, removable panels or modular components can be reviewed when the drawing identifies the update method, material, retained frame and access requirements.
How should a wayfinding sign schedule be prepared?
Use a unique sign code for every type and location, then provide the message, arrow direction, dimensions, material, mounting and quantity. The same codes can be carried into production and packing labels.
Can signs be grouped for different floors or buildings?
Yes. Components can be labeled and grouped by floor, zone, building or installation phase when the destination schedule is provided before packing.
Can SZRBS produce one sample before the main order?
Yes. One sample can be manufactured for approval. The typical sample lead time is 5–7 days, subject to the construction and finish.
What is the typical bulk production lead time?
Typical bulk production is 10–15 days after the drawings, sample and commercial details are approved. Complex or unusually large signs are confirmed separately.
Who approves the wording and arrows in a wayfinding package?
The buyer and its project design team should approve the messages, arrow directions, sign codes and locations before manufacturing. SZRBS uses the approved message and destination schedules to coordinate the sign components and packing references.
Are custom sizes and OEM/ODM orders available?
Yes. Customer drawings, custom sizes and OEM/ODM production are accepted after a feasibility review of the materials, finish, structure and installation details.
What warranty is provided?
The standard product warranty is three years. The applicable scope and conditions are confirmed in the quotation for the specific product and project.
